IEEE

SCD0 - Electrical Substation Design

WGD2 – Cable Systems in Substations


Scope: The scope of the Cable Systems Working Group is:

  • Design, installation, and protection of insulated wire and cable systems in substations with the objective of minimizing cable failures and their consequences.
  • Provide guidance to the substation engineer in established practices for the application and installation of metallic and optical cables in electric power transmission and distribution substations with the objective of minimizing premature cable failures and their consequences.
  • Emphasize reliable electrical service and safety during the design life of the substation.

Standard: 525-2016 – IEEE Guide for the Design and Installation of Cable Systems in Substations

Working Group Officers:

DJ Moreau
WGD2 Chair

Portland General Electric

LinkedIn
Alan Gaetz
WGD2 Vice-Chair

HDR
-

LinkedIn
Martin-Denise Long
WGD2 Secretary
LinkedIn